Designing recovery across two offices
Engineering experience with clustered Unix storage, synchronisation and recovery planning.
An organisation with two offices needed shared data at both locations and a way to recover after disruption. The engineering assignment covered the design and implementation of a Unix storage and backup cluster, bidirectional synchronisation between offices, and development of the disaster recovery plan.
Three different jobs
The cluster addressed availability of the storage service. Synchronisation carried changes between offices. Backup served a different purpose: a deletion or damaged file can propagate to the other office, so recovery needs an earlier copy.
What the recovery plan has to answer
Which copy should operators trust after an interruption? Which services depend on it? In what order should they bring those services back and reopen synchronisation? These are useful acceptance questions for a comparable project today.
